Selection of Agency for Implementation Support under Swachh Bharat Mission – Urban 2.0 (SBM-U 2.0)-Jobat (M.P.)

Consultancy Tender Preparation

Key Information – At a Glance

FieldDetails
StateMadhya Pradesh (M.P.)
Issuing AuthorityOffice of Municipal Council, Jobat (M.P.)
Title of Tender/RFPSelection of Agency for Implementation Support under Swachh Bharat Mission – Urban 2.0 (SBM-U 2.0)
Estimated Contract ValueAs per portal (not specified in document)
Tender Fee (Bid Document Fee)₹5,000
EMD (Earnest Money Deposit)₹50,000
Last Date (Technical Bid Opening Start)25/04/2026 at 17:30 PM
Time of SubmissionNot explicitly stated; refer to portal. RFP publishing date: 25/03/2026 11:00 AM
Mode of SubmissionOnline via https://mptenders.gov.in (hard copy if required to ULB office)
DOWNLOAD Tender/EOIDOWNLOAD RFP
Available from 25/03/2026, 11:00 AM on the above portal

Detailed Summary of the RFP

1. Purpose of the RFP

Municipal Council Jobat seeks to hire a qualified agency (NGO/Company/Firm/Consortium) for end-to-end implementation support under SBM-U 2.0. The goal is to improve solid waste management (SWM), sanitation, citizen participation, and performance in Swachh Survekshan 2025-26.

2. Contract Period & Security

  • Duration: 12 months, extendable by another 12 months based on performance.
  • Performance Security: 10% of contract value (Bank Guarantee/DD within 15 days of LoA).

3. Key Objectives (High-Level)

  • 100% door-to-door (D2D) collection with source segregation.
  • Improve processing of wet/dry/domestic hazardous waste (DHW) with a revenue model.
  • Execute IEC/BCC campaigns & social media management.
  • Eliminate Garbage Vulnerable Points (GVPs) & Chronic Trashing Units (CTUs).
  • Monitor community/public toilets (CT/PT) to ODF++/Water+ standards.
  • Institutionalize citizen engagement & grievance redressal.
  • Provide handholding, documentation, MIS to ULB.

4. Detailed Scope of Work (Major Components)

ComponentKey Activities
A. Swachh Survekshan 2025-26 PrepGap analysis, mock assessments, ward audits, proof documentation, training.
B. IEC/BCC & Social MediaCity-wide plan, creatives (print/AV/digital), manage social media, community mobilization via RWAs/SHGs.
C. 100% D2D Collection & SegregationRoute optimization, ICT (GPS/RFID), crew training, 3-bin system, weekly reporting.
D. MSW Processing + Revenue ModelOperate MRF/composting units; revenue share / fixed fee / hybrid model (to be finalized by ULB).
E. 3R & RRR CentersSupport RRR centers, Neki ki Deewar, crockery/book/toy banks, monthly reuse targets.
F. Citizen EngagementGrievance app promotion, satisfaction surveys, dashboards, ward committee meetings.
G. Field MonitoringDaily/weekly checks on collection, sweeping, processing plants; issue resolution.
H. CT/PT Toilets MonitoringChecklist-based audits (cleanliness, O&M, safety, inclusivity), red-spot removal.
I. Elimination of GVPs/CTUsHotspot mapping, engineering/IEC solutions, before-after documentation, sustainability plan.
J. Documentation & MISMonthly reports, geo-tagged photos/videos, case studies, best practices.
K. CSR & PPPIdentify partners, concept notes, MoUs, due diligence.
L. Other SBM-U 2.0 TasksAny additional SWM/sanitation tasks assigned by ULB/State/GoI.

5. Mandatory Eligibility Criteria (Summarized)

RequirementDetail
Entity TypeRegistered company/firm/society/NGO
Experience in MSWMinimum 5 years after registration
TurnoverAverage ₹50 Lakh in last 3 financial years (with BS, P&L, ITR)
RegistrationsEPF, ESIC, GST, PAN, ISO certificate
Experience in 3/5 Star ULBsWork in at least 3 ULBs declared by MoHUA in Swachh Survekshan 2024
Water Plus TrainingKey person trained on Water Plus Protocol by any govt. institute
IEC ProjectAt least one IEC project of ₹50 Lakh or more (with work order & completion certificate)
IEC under SBM (Urban)In at least 3 ULBs with population >50,000
D2D Collection & TransportExperience in at least 1 ULB (population >50,000) with driver, helper, vehicle maintenance
Source Segregation ProjectExperience in >3 IEC projects with 100% source segregation in ULBs >50,000 population (authority-verified)
Water Plus CitiesExperience in >3 Water Plus cities declared by MoHUA
BlacklistingNot blacklisted by any Govt./organization in last 3 years (affidavit required)

6. Proposed Minimum Manpower

PositionQualification & ExperienceNo.
Team Leader / Project ManagerGraduate/PG; ≥5 yrs in SBM/SWM, SS assessments1
SWM/Operations SpecialistGraduate; ≥3 yrs in D2D, MRF/processing1
IEC & Social Media LeadPG/Graduate in Mass Comm; ≥3 yrs1
Data & MIS OfficerGraduate; data analysis, dashboards1
Field Coordinators / Community Mobilizers12th pass/Graduate; good communication4–8
MRF/Processing SupervisorGraduate/Diploma; waste processing experience1
CT/PT Monitors10+2; audit & reporting capability2

7. Key Performance Indicators (KPIs) – Summary

KPITarget
HH & commercial coverage≥95% within 6 months
Compliant source segregation≥90% within 6 months
Dry waste to MRF≥80%
Wet waste processed≥70%
GVPs/CTUs eliminatedWithin 4 months, zero re-emergence for 3 months
CT/PT monthly audits100%; ≥85% meet ODF++/Water+ standards
IEC drivesMin 2 major/month; ≥12 digital creatives/month
Grievance closure SLA≥90% within stipulated time
Training sessionsQuarterly for ULB/contract staff

8. Bid Submission & Evaluation

  • Mode: Online (MPTenders.gov.in)
  • Method: QCBS (Quality & Cost Based Selection) – 70:30 (Technical:Financial) – may be modified by ULB.
  • Technical Bid Minimum Qualifying Score: 60/100 (tentative)
  • Financial Evaluation: Lowest evaluated price (L1) or composite score:
    S = 0.7*T + 0.3*Fn where Fn = 100*L1/Fi

9. Commercials & Payment

  • Bidders quote: monthly professional fee + MSW revenue model terms (GST extra).
  • Revenue model options (to be finalized by ULB):
    • Revenue Share (Agency __% : ULB __%)
    • Fixed Processing Fee (₹/MT)
    • Hybrid
  • Payment: Monthly, after acceptance of deliverables & KPI reports.
  • Penalties: For shortfall in D2D coverage, missed IEC drives, delayed reports, data falsification (may lead to termination & blacklisting).

10. General Terms

  • Confidentiality & IP: All data/creatives owned by ULB.
  • Labour compliance: Labour laws, PPE, insurance for staff.
  • Applicable rules: MSW Rules 2016 (amendments), Plastic Waste Rules, C&D Waste Rules, SBM-U 2.0 guidelines.
  • Right to reject: ULB reserves right without assigning reasons.

11. Technical Bid Submission Checklist (Summary)

  • Covering Letter (Form TECH-1)
  • Bidder information & legal documents (Incorporation, PAN, GST, ESI/EPF)
  • Non-blacklisting undertaking & affidavit
  • Experience credentials (work orders/completion certificates)
  • Team CVs & deployment plan
  • Methodology, work plan, Gantt chart
  • CSR/PPP strategy (optional)
  • Financial statements (last 3 years) & turnover certificate
  • EMD proof & tender fee receipt
  • Signed RFP & corrigenda

12. Annexures Referenced in RFP

  • Form TECH-1 to TECH-6
  • Form FIN-1 (Monthly professional fee)
  • Form FIN-2 (MSW Processing Revenue Model)
  • Format for Performance Bank Guarantee

IMPORTANT DISCLAIMER: This post contains a summary generated by Artificial Intelligence (AI) for informational purposes only. SKILLSPEDIA.IN is a private entity and is not affiliated with any government agency. Document Access: To facilitate easy download, we may provide a backup copy of the tender document via Google Drive. Please note that the Tender Authority may issue updates (Corrigendums) at any time which may not be reflected in our copy. User Duty: Always verify details and check for updates on the Official Tender Website before bidding. We accept no liability for discrepancies or outdated information.